The ADU construction process in San Ramon typically takes between 6 to 12 months, depending on various factors such as design complexity, permitting, and construction type. At Nestadu, a leading ADU builder in San Ramon, we ensure a streamlined and efficient process for both prefab and site-built ADUs.
Timeline for ADU Construction in San Ramon:
1. Initial Consultation and Planning (1-2 months):
•Meet with our Nestadu team to discuss your ADU project, explore design options, and conduct a site assessment.
•Develop detailed plans and prepare the necessary documents for permitting.
2. Permitting and Approvals (2-4 months):
•Submit your ADU plans to the San Ramon building department for review.
•Work with local authorities to ensure your project meets all zoning regulations and building codes.
3. Construction Phase (3-6 months):
•Prefab ADUs: Factory construction typically takes a few months, followed by on-site assembly and finishing.
•Custom ADUs: On-site construction involves foundation work, framing, installation of utilities, and interior finishing.
4. Final Inspections and Approval (1 month):
•Conduct final inspections to ensure compliance with local regulations.
•Obtain a certificate of occupancy from the San Ramon+9 building department.
Factors Affecting the Timeline:
•Design Complexity: Custom designs may require more time for planning and approvals.
•Permitting Delays: Regulatory reviews can extend the timeline.
•Construction Type: Prefab ADUs are generally faster to complete than site-built ADUs.
By choosing Nestadu, your premier ADU builder in San Ramon, you can expect a smooth and efficient construction process. Whether you’re interested in a prefab ADU, custom ADU, granny flat, cottage, or in-law suite, our team is dedicated to delivering high-quality results on time.