The ADU construction process in Rosemead typically takes between 6 to 12 months, depending on various factors such as design complexity, permitting, and construction type. At Nestadu, a leading ADU builder in Rosemead, we ensure a streamlined and efficient process for both prefab and site-built ADUs.
Timeline for ADU Construction in Rosemead:
1. Initial Consultation and Planning (1-2 months):
•Meet with our Nestadu team to discuss your ADU project, explore design options, and conduct a site assessment.
•Develop detailed plans and prepare the necessary documents for permitting.
2. Permitting and Approvals (2-4 months):
•Submit your ADU plans to the Rosemead building department for review.
•Work with local authorities to ensure your project meets all zoning regulations and building codes.
3. Construction Phase (3-6 months):
•Prefab ADUs: Factory construction typically takes a few months, followed by on-site assembly and finishing.
•Custom ADUs: On-site construction involves foundation work, framing, installation of utilities, and interior finishing.
4. Final Inspections and Approval (1 month):
•Conduct final inspections to ensure compliance with local regulations.
•Obtain a certificate of occupancy from the Rosemead+9 building department.
Factors Affecting the Timeline:
•Design Complexity: Custom designs may require more time for planning and approvals.
•Permitting Delays: Regulatory reviews can extend the timeline.
•Construction Type: Prefab ADUs are generally faster to complete than site-built ADUs.